Skip to main content

Content loaded within last 14 days Experiences and lessons learned from solar energy facility post-construction noise studies

Buy Article:

$15.00 + tax (Refund Policy)

Solar energy facilities are being constructed throughout the United States in a push for more power generation from renewable energy sources. These facilities have solar array inverters and substation transformers that generate noise. This paper discusses challenges and lessons learned from several solar energy project post-construction noise studies, including evaluating compliance with regulatory limits, validating noise modeling procedures, and inverter noise mitigation.

The requested document is freely available to subscribers. Users without a subscription can purchase this article.

Sign in

Document Type: Research Article

Affiliations: Stantec

Publication date: 25 July 2025

More about this publication?
  • The Noise-Con conference proceedings are sponsored by INCE/USA and the Inter-Noise proceedings by I-INCE. NOVEM (Noise and Vibration Emerging Methods) conference proceedings are included. All NoiseCon Proceedings one year or older are free to download. InterNoise proceedings from outside the USA older than 10 years are free to download. Others are free to INCE/USA members and member societies of I-INCE.

  • Membership Information
  • INCE Subject Classification
  • Ingenta Connect is not responsible for the content or availability of external websites
  • Access Key
  • Free content
  • Partial Free content
  • New content
  • Open access content
  • Partial Open access content
  • Subscribed content
  • Partial Subscribed content
  • Free trial content