
Monitoring Railway Noise, Rail and Wheel Roughness
Today monitoring of railway noise is essential for many reasons: On the one hand recognition of effectiveness of noise mitigation measures in a very soon stage and on the other maintenance surveillance . In the latter mainly wheel running surfaces regarding wheel flats and corrugations
are essential and on the track side impact noise at poor welds, switches and insulation joints as corrugation can be surveilled. Also some maintance processes as rail grinding according to DIN EN 13231-3:2012 criteria is done more and more which is accoustically insufficient in general . To
take into respect the "acoustic roughness criteria "required by DIN ISO 3095:2013. is regarded too expensive by most infrastructure undertakings. After re-present the "acoustic criteria " in the form of limit roughness that can exist on rails after re-profiling, the acceptance of acoustic
grinding work will be discussed in this presentation also.
The requested document is freely available to subscribers. Users without a subscription can purchase this article.
- Sign in below if you have already registered for online access
Sign in
Document Type: Research Article
Publication date: 21 August 2016
The Noise-Con conference proceedings are sponsored by INCE/USA and the Inter-Noise proceedings by I-INCE. NOVEM (Noise and Vibration Emerging Methods) conference proceedings are included. All NoiseCon Proceedings one year or older are free to download. InterNoise proceedings from outside the USA older than 10 years are free to download. Others are free to INCE/USA members and member societies of I-INCE.
- Membership Information
- INCE Subject Classification
- Ingenta Connect is not responsible for the content or availability of external websites
- Access Key
- Free content
- Partial Free content
- New content
- Open access content
- Partial Open access content
- Subscribed content
- Partial Subscribed content
- Free trial content