Skip to main content

Free Content Validating construction noise models for utility discovery operations

Download Article:
Public utility systems often run underground. Before constructing a new light rail system, it is necessary to positively locate, and potentially move, utility lines. This requires the use of various types of construction equipment, including a vacuum truck/excavator, jack hammer, pavement saw, air hose, and equipment for tamping and installing steel plates. Sound levels were measured at multiple sites for these utility discovery operations, and results will be presented in terms of both broadband and 1/3-octave band levels. The broadband sound levels were also compared to those predicted using two construction noise models: the Federal Highway Administration Roadway Construction Noise Model (RCNM) and CadnaA. These comparisons will be presented, showing the validity of each model for predicting utility discovery operations.

Keywords: 52.6; 76.1

Document Type: Research Article

Affiliations: ATS Consulting

Publication date: 13 June 2016

More about this publication?
  • The Noise-Con conference proceedings are sponsored by INCE/USA and the Inter-Noise proceedings by I-INCE. NOVEM (Noise and Vibration Emerging Methods) conference proceedings are included. All NoiseCon Proceedings one year or older are free to download. InterNoise proceedings from outside the USA older than 10 years are free to download. Others are free to INCE/USA members and member societies of I-INCE.

  • Membership Information
  • INCE Subject Classification
  • Ingenta Connect is not responsible for the content or availability of external websites
  • Access Key
  • Free content
  • Partial Free content
  • New content
  • Open access content
  • Partial Open access content
  • Subscribed content
  • Partial Subscribed content
  • Free trial content